PPE required on site
Mandatory PPE
Please Note:
If a Visitor does not have Safety Boots, then shoes MUST be closed – no open toed shoes allowed onsite. Visitor will not be allowed in the processing area.
PPE as required in Operational areas
Site Induction and Visitor Sign In
Truck Drivers
All truck contractors are required to complete the Driver Daily Fit for Duty form every day you arrive at our site. This form also includes Site Induction information that informs you of our site requirements when beingon our site.
General Contractors
All general contractors (electricians, vehicle mechanics etc) must report to the office and sign in using the QR code onsite.
Regular contractors are required to complete a Site Induction that will be re-issued every 18 months.
You are still required to sign in via the QR code every site visit.
Site Visitors
All visitors must report to the office to sign in and out (contactless).
Visitors are not permitted onto the processing area without an escort.
The QR code below is on display at site office - you will use this code to check in and out of the premises.